We use cookies on this site to enhance your online experience. By continuing to use this site, you agree to accept cookies.

OK

Katherine

Displaying 1 to 10 of 11 Posts . Displaying 10 of Posts . Page of 2 . Go To Page: . Per Page: . . . View All Sort By: .

Public Notice: Road Maintenance

Re:   Malpass Rd, McQuarrie Rd & Rashdale Rd Township crews will be out to remedy roads on Malpass, McQuarrie and Rashdale over the next few days. Any concerns or questions should be directed to the Township of Spallumcheen,  Attn: Manager of Operations @  mail@spallumcheentwp.bc.ca We thank you for your cooperation and patience during this time.

Read More

Public Notice - Fortis Gas Installation - Otter Lake Rd

The Township of Spallumcheen would like to advise that Fortis Gas will be in the area of Otter Lake Road between October 12th and October 19, 2021. We would ask for your patience and consideration during this time while alternating single-lane traffic is being conducted between 1510 Otter Lake Rd and the intersection of Otter Lake Rd & Wallbridge Rd. Please respect flaggers and construction workers in the area and adhere to all road signs. If you have any questions, please do not...

Read More

Public Notice - Fortis Gas Installation - Young Road

The Township of Spallumcheen would like to advise that Fortis Gas will be in the area of Young Road between October 2nd and October 12, 2021. We would ask for your patience and consideration during this time while alternating single-lane traffic is being conducted between 2320 and 2580 Young Rd. Please respect flaggers and construction workers in the area and adhere to all road signs. If you have any questions, please do not hesitate to contact the office at 250-546-3013. Tyler...

Read More

Public Notice - Lansdowne Waterworks District - Water Shut Off

Residents connected to the Lansdowne Waterworks District are advised of a planned water outage scheduled between the hours of 7:00 am to 3:00 pm on Friday, Sept 17, 2021 . The interruption is for infrastructure improvements to the system. Residents are recommended to: • shut off hot and cold faucets and any equipment that requires water, • store sufficient drinking water for the anticipated period of interruption, • isolate the supply to hot water tank, • fill a...

Read More

Current Water Restrictions - Updated

Larkin Water Service Area STAGE 2 Water Restrictions RESCINDED The Township of Spallumcheen has removed the STAGE 2 water restrictions on the Larkin Water Service Area effective immediately . Thank you for your cooperation throughout the restriction period. Tyler McNeill Manager of Operations

Read More

Public Notice - Water Shut Off - Lansdowne Waterworks District

Residents connected to the Lansdowne Waterworks District are advised of a planned water outage scheduled between the hours of 7:00 am to 3:30 pm on Thursday Sept 2, 2021. The interruption is for infrastructure improvements to the system. Residents are recommended to: • shut off hot and cold faucets and any equipment that requires water, • store sufficient drinking water for the anticipated period of interruption, • isolate the supply to hot water tank, • fill a bathtub...

Read More

Public Notice - Water Shut Off - Lansdowne Waterworks District

  Residents connected to the Lansdowne Waterworks District are advised of a planned water outage scheduled between the hours of 8:00 am to 10:00 am on Wednesday July 28, 2021. The interruption is for infrastructure improvements to the system. Residents are recommended to: • shut off hot and cold faucets and any equipment that requires water, • store sufficient drinking water for the anticipated period of interruption, • isolate the supply to hot water tank,...

Read More

Notice of Crack Sealing Program

NOTICE OF CRACK SEALING PROGRAM   Please be advised that Township of Spallumcheen Public Works crew is scheduled to commence the annual Crack Sealing Program. The work is scheduled to commence on or about Monday July 12, 2021 and will take approximately four weeks to complete, weather permitting.  Please note that the following roads are identified for this Crack Sealing Program: 1. Back Enderby Road 2. Lansdowne Road 3. Sleepy Hollow Road 4. Stepney Cross Road...

Read More

Invitation to Tender - Graded Aggregate Seal Coat Program

  The Township of Spallumcheen is inviting tenders for approximately 32 km (approx. 204,195 m2) of graded aggregate seal coat work. All previously sealed roads (approx. 200,907 m2) will require a single seal coat. The remainder of the roads which have never been sealed (approx. 3,288 m2) will require a double seal over the existing gravel road. All 32 km of road will require new centreline painting. The Township will be providing the aggregate materials, loading equipment and equipment...

Read More

Fortis Transmission Pipeline Survey

The survey is scheduled to commence in April 2021 and we anticipate all work to be completed by the end of October 2021.  The technicians will be working Monday to Saturday between 7 a.m. and 6 p.m.  As the schedule is dictated by weather conditions and other operational requirements, we are unable to notify you in advance of the exact date the survey will be undertaken through your property. If you have any questions or concerns, please email Interior Pipeline Operations at...

Read More